Home / The library / Applied Hydraulics / Hydraulic structures / Redridge timber crib dam


Redridge timber crib dam


  • Redridge timber crib dam

Description
AD 1894 - Redridge timber crib dam: old timber crib weir upstream of the Redridge steel dam. Completed in 1894, the dam was 16.1 m thick at base, 8.5 m thick at crest and 15.2 m high.

Author
Hubert Chanson
Date
2001
Copyright
Hubert Chanson, Dept. of Civil Engineering, University of Queensland, Australia




IAHR Media Library

This web site was launched by Prof. Michele Mossa of the Polytechnic University of Bari (Italy) with the initial support of Fondazione Caripuglia, Bari, Italy for the Research Project LIC-MON of 2003 and of the Project IMCA (Integrated Monitoring of Coastal Areas) financed by MIUR PON D.M. 593/00. Later, the initiative was supported with other Prof. Michele Mossa’s funds, most recently provided by the RITMARE Project.


IAHR Media Library
Advertise with us

for more information please contact us: info@iahrmedialibrary.net

© IAHR Media Library
Alticom - studio