Home / The library / Applied Hydraulics / Hydraulic structures / Tillot dam (France 1834)


Tillot dam (France 1834)


  • Tillot dam (France 1834)

Description
Tillot dam (France 1834), built as a feeder of the Canal de Bourgogne. It is equipped with a stepped spillway (design flow rate : 19 m3/s) with converging sidewalls. View from upstream in January 1997.

Author
Hubert Chanson
Date
1997-2000
Copyright
Hubert Chanson, Dept. of Civil Engineering, University of Queensland, Australia




IAHR Media Library

This web site was launched by Prof. Michele Mossa of the Polytechnic University of Bari (Italy) with the initial support of Fondazione Caripuglia, Bari, Italy for the Research Project LIC-MON of 2003 and of the Project IMCA (Integrated Monitoring of Coastal Areas) financed by MIUR PON D.M. 593/00. Later, the initiative was supported with other Prof. Michele Mossa’s funds, most recently provided by the RITMARE Project.


IAHR Media Library
Advertise with us

for more information please contact us: info@iahrmedialibrary.net

© IAHR Media Library
Alticom - studio