Home / The library / Geophysical Hydraulics / Eco-hydraulics / Fish passage with stacked boulders


Fish passage with stacked boulders



Description
Fish passage with stacked boulders was installed at drop structure in Rusha river of Shiretoko Peninsula, Hokkaido by Youichi Yasuda. The averaged size of bouders is 60 cm. In this case, the stacked boulders without concrete were installed as a temporary installation. The stacked construction is very important for the stability of boulders.

Author
Youichi Yasuda
Date
August, 2020
Copyright
no
References
Yasuda, Y. 2018, Practical approach from experimental investigation on fish passage with stcking boulders installed in weir, Advances in River Engineering, JSCE, Vol. 24, pp.125-130




IAHR Media Library

This web site was launched by Prof. Michele Mossa of the Polytechnic University of Bari (Italy) with the initial support of Fondazione Caripuglia, Bari, Italy for the Research Project LIC-MON of 2003 and of the Project IMCA (Integrated Monitoring of Coastal Areas) financed by MIUR PON D.M. 593/00. Later, the initiative was supported with other Prof. Michele Mossa’s funds, most recently provided by the RITMARE Project.


IAHR Media Library
Advertise with us

for more information please contact us: info@iahrmedialibrary.net

© IAHR Media Library
Alticom - studio